ICT PHYSICAL CONSULTANCY

ICT Physical Consultancy Services — Construction Related Projects

Registered ECP with BEM and licensed ICT Consultant with MOF, 10CS delivers comprehensive physical ICT consultancy for hospitals, universities, government buildings, and mission-critical construction projects across Malaysia.

🏭
22+
Years Experience
🎯
ECP
Registered with BEM
🏢
MOF
Code 330114
OUR CREDENTIALS

Registered, Qualified, and Proven

Through our subsidiary Asharah Consulting Services Sdn Bhd (Asharah), we hold the qualifications required to deliver physical ICT consultancy services for government and private sector construction projects across Malaysia.

Registered Engineering Consultancy Practice (ECP) with BEM
Board of Engineers Malaysia — fully qualified to provide physical ICT consultancy services for construction projects
MOF Consultancy License — Code 330114
Perkhidmatan Perunding Fizikal / Kejuruteraan Telekomunikasi — Ministry of Finance registered ICT consultant
Government Project Track Record
D&B projects with JKR, MOE, MOH, MOFA | PFI projects with UKAS, ICU under PMD and MOHE
Healthcare ICT Specialization
Tertiary hospitals, teaching hospitals, research & specialized healthcare facilities since 2004
SECTORS SERVED

High-Impact Construction Projects

For more than 22 years, we have contributed to high-impact and large-scale construction projects with direct involvement with JKR, MOH, MOHE, ICU PMD, UKAS PMD, and MOFA.

Tertiary & Teaching Hospitals
Public Universities
Government Administrative Buildings
Research & Specialized Facilities
Education Institutions
Ministry & Agency Headquarters
KEY SERVICE AREAS

Comprehensive ICT Physical Consultancy Coverage

Our consultants are well-versed in design standards, guidelines, processes, and documentation from pre-bid through post-construction stages across all 16 ICT physical service areas.

Structured Cabling System (SCS/NCI)
Interbuilding, intrabuilding, horizontal & wireless networks
Active Network Equipment
Switches, servers, storage, wireless controller & backup systems
Telephone Infrastructure
IP PBX, handsets, external telecom works & ISP coordination
Integration Works
Full system interoperability with existing ICT & telephone facilities
In-Building Coverage (IBC)
Cellular system feasibility study compliant with MCMC/SKMM standards
UPS Systems
Power backup for data centers, TCRs, workstations & IP PBX
Office Automation (OA) System
End-user, hospital-grade equipment & telepresence systems
Data Center / TCR Facilities
Mission-critical facility design with cooling, FSS, EMS & security
Application Development
URS to SDS — full lifecycle app design, customization & integration
Library System & Facilities
Integrated RFID-enabled library systems with digital automation
Security Posture Assessment (SPA)
Penetration testing, NSA, WSA, ASA, HSA, DSA & policy review
BCP & Disaster Recovery
Business continuity and technical infrastructure recovery planning
ICT Training Room / Computer Lab
Fully equipped training facilities with lab management software
Training for Key-Users & Admins
Application, network, system & software training programs
Hospital Application System (HIS)
HIS, LIS, RIS, PACS, CCIS, OTMS & medical device integration
IP Security System (IPSS)
IP CCTV, EACS, IP ISMS & boom gate aligned with CGSO requirements
CORE PILLARS IN DETAIL

Six Critical ICT Physical Consultancy Pillars

Our specialist capability in these six domains forms the core of our physical ICT consultancy practice, covering complex healthcare, security, continuity, and infrastructure requirements.

PILLAR 01
Structured Cabling System (SCS) & Network Cabling Infrastructure
SCOPE OF WORKS
  • 1.Pre-bid, pre-construction, construction & post-construction stages coverage
  • 2.Interbuilding, intrabuilding, horizontal & wireless (Wi-Fi) network requirements
  • 3.IP Security System (IPSS) — IP CCTV, IP Card/Door Access, IP ISMS & Boom Gate
  • 4.Non-healthcare project ICT requirements
  • 5.Medical Equipment Planning for healthcare & hospital projects
KEY DELIVERABLES
  • 1.SOA for ICT Facilities / ICT Components
  • 2.Single Line / Schematic Diagrams
  • 3.ICT Conceptual Design
  • 4.ICT Technical Proposal
  • 5.Technical Specifications
  • 6.Catalogues / Brochures / Datasheets
  • 7.Detailed Design Calculations
  • 8.Tender / Construction / Shop / As-Built Drawings
  • 9.Contract / Tender Sum Analysis
  • 10.Detailed Bill of Quantities (BoQ)
  • 11.As-Built Documentation
PILLAR 02
Data Center / Server Room / Telecommunication Closet Room (TCR) Facilities
SCOPE OF WORKS
  • 1.Centralized 24/7 operational data center environment design
  • 2.Server Room, NOC Room, Staging Room, M&E Rooms, UPS & Battery Room
  • 3.Cabling Infrastructure & InRow Cooling System
  • 4.Fire Suppression (FSS) & Water Leak Detection (WLDS)
  • 5.Early Warning Smoke Detection & Environmental Monitoring (EMS)
  • 6.Equipment Rack, Containment, Raised Floor & Electrical Systems
  • 7.Physical Security (CCTV & Card Access) & Earthing Requirements
KEY DELIVERABLES
  • 1.Single Line / Schematic Diagrams
  • 2.ICT Conceptual Design
  • 3.ICT Technical Proposal
  • 4.Technical Specifications
  • 5.Catalogues / Brochures / Datasheets
  • 6.Detailed Design Calculations
  • 7.Tender / Construction / Shop / As-Built Drawings
  • 8.Contract / Tender Sum Analysis
  • 9.Detailed Bill of Quantities (BoQ)
  • 10.As-Built Documentation
  • 11.Claim Documentation
PILLAR 03
IP Security System (IPSS) — CCTV, EACS & Boom Gate
SCOPE OF WORKS
  • 1.CCTV System — integrated digital surveillance aligned with CGSO requirements
  • 2.Electronic Access Control System (EACS) with integrated hardware & software
  • 3.Boom Gate System (Vehicle Access Barrier) per JKR & CGSO guidelines
  • 4.Design for specialized areas: sleep study, child monitoring, sensitive spaces
  • 5.VMS, recording, storage, retention, power continuity & future expansion
  • 6.Integration with existing systems adaptable to evolving security requirements
KEY DELIVERABLES
  • 1.Single Line / Schematic Diagrams
  • 2.ICT Conceptual Design
  • 3.ICT Technical Proposal
  • 4.Technical Specifications
  • 5.Catalogues / Brochures / Datasheets
  • 6.Tender / Construction / Shop / As-Built Drawings
  • 7.Contract / Tender Sum Analysis
  • 8.Detailed Bill of Quantities (BoQ)
  • 9.As-Built Documentation
PILLAR 04
Hospital Application System & HIS Integration (Health Facilities)
SCOPE OF WORKS
  • 1.Cloud-based COTS HIS, LIS, RIS, OTMS, CCIS, PACS, PhIS, OIS, BBIS
  • 2.Third Party Software: SMRP, eGL, HIE, eNCDC, MyCMX/DRG, NSFIRM integration
  • 3.Hospital Information System Hardware & Network Cabling Infrastructure
  • 4.HIS integration with medical devices & LIS interfacing with analysers
  • 5.RIS PACS integration with imaging modalities
  • 6.Integration Platform for inter-facilities interoperability
KEY DELIVERABLES
  • 1.ICT Conceptual Design
  • 2.ICT Technical Proposal
  • 3.Technical Specifications
  • 4.Catalogues / Brochures / Datasheets
  • 5.Contract / Tender Sum Analysis
  • 6.Detailed Bill of Quantities (BoQ)
  • 7.As-Built Documentation
PILLAR 05
Security Posture Assessment (SPA)
SCOPE OF WORKS
  • 1.Penetration Testing (internal & external)
  • 2.Stress / Load Testing & Network Security Assessment (NSA)
  • 3.Wireless Security Assessment (WSA) & Application Security Assessment (ASA)
  • 4.Host Security Assessment (HAS) & Database Security Assessment (DSA)
  • 5.Physical Security Review — server rooms, TCRs & ICT spaces
  • 6.ICT Security Policy Review inclusive of CCTV & monitoring networks
  • 7.Compliance: MyMIS, ISO 27001, Surat Pekeliling Am Bil. 3/2009
KEY DELIVERABLES
  • 1.SPA Strategy & Implementation Plan
  • 2.Pre-Assessment Documentation
  • 3.Assessment Process & Activity Documentation
  • 4.Post-Assessment & Solution Proposal Report
  • 5.Final Findings Report & Recommendations
PILLAR 06
Business Continuity Plan (BCP) & Disaster Recovery Plan (DRP)
SCOPE OF WORKS
  • 1.BCP: Business-level survival — operations continue during system unavailability
  • 2.BCP: IT infrastructure design supporting scheduled downtime limits
  • 3.DRP: Technical infrastructure recovery at different levels of system failure
  • 4.DRP: Contingency measures to minimize service disruption & prevent data loss
  • 5.DRP: Technical architecture including network continuity & resilience features
  • 6.On-site simulation tests before Certificate of Practical Completion (CPC)
KEY DELIVERABLES
  • 1.Risk Assessment & Business Impact Analysis (BIA)
  • 2.Disaster Recovery (DR) Technical Architecture
  • 3.BCP / DRP Frameworks
  • 4.Training Program on Emergency Response Actions
  • 5.Maintenance Schedules for Policy Updates
  • 6.Audit-Ready Documentation for Compliance Verification
DELIVERY APPROACH

Full Coverage Across All Construction Stages

Our team covers the complete project lifecycle — from initial bid preparation through final handover and defect liability period support.

Stage 1
Pre-Bid
SOA, conceptual design, technical proposals & feasibility
Stage 2
Pre-Construction
Detailed design, specifications, drawings & BoQ
Stage 3
Construction
Site supervision, implementation coordination & progress monitoring
Stage 4
Post-Construction
As-built documentation, DLP support, SLA & maintenance
WHY CHOOSE 10CS

What Sets Our Physical ICT Consultancy Apart

22+ Years of Specialist ICT Experience
Established in 2004, with deep expertise across hospital, education, and government construction ICT.
Dual Government Registration
Registered ECP with BEM and MOF-licensed ICT consultant — meeting the most stringent government requirements.
Healthcare ICT Leadership
Unmatched experience in tertiary hospital, teaching hospital, and specialized healthcare facility ICT design.
Compliance & Security Focus
All designs adhere to CGSO, JKR, MOH, MCMC, and international security standards.
TAKE THE NEXT STEP

Commission Expert ICT Physical Consultancy

Talk to 10CS about your next construction project. Whether it is a tertiary hospital, public university, government building, or mission-critical facility, we bring 22 years of registered ECP expertise to every engagement.